On with the careful placing of the drops that are never actually dropped and always carefully placed…

On with the careful placing of the drops that are never actually dropped and always carefully placed. Part 225 to 234 went out on Friday evening and the East London sunshine of Saturday morning.  Last weekend of September and the 365 pieced year-long piece of work goes on. Pieces most on offcut pieces of wood fished out of a skip by a woodwork workshop by London Fields, Hackney, East London. Pieces placed on Brick Lane, around Shoreditch and….